Elevated performed the erection of Sunnyvale’s first mass timber project; an all-electric five-story LEED Platinum office building that is projected to have 96% fewer embodied carbon emissions compared to an equivalent steel and concrete structure, when factoring in sequestration. As an integral part of the design-build team, Elevated contributed to the building’s success, starting with the design phase of the project. The team collaborated with the GC and client to construct a full-scale, two-story timber bay mockup and, together with the greater design-build team, participated in material testing that informed the final design and project execution plan. In addition, Elevated contributed to constructability reviews and options analysis during preconstruction and played a key role in early timber receipt, storage, staging, and timely erection on this complex mass timber project.